Home Health Center Search Comments Help Ask a Librarian

Renovation Outline
About the Architects
Campus Planning, Design &

Renovation Timetable
The Most Current Work

We're on the move!
Temporary Location of     Collection and Services
Pictorial Progress of the Construction
Ask Questions
Ways to Give

Back to the Main Renovation Page

Renovation Timetable

Start Date

Completion Date

Phase I, Main Library Floor

Mar 22

Nov 22

Phase II, HSEC

Apr 27

Aug 1

Phase III, 24 Hour Study Room
(Old Check-In Area)

Nov 22

Jan 1




Home   UConn Health Center   Search   Comments   Help  Ask a Librarian

Copyright 1998 - 2006. All Rights Reserved.
Lyman Maynard Stowe Library at the University of Connecticut Health Center
263 Farmington Ave. P.O. Box 4003
Farmington, Connecticut 06034-4003
The URL for this page is: http://library.uchc.edu/renovation/timetable.html
Last Updated: February 26, 2008