Home Health Center Search Comments Help Ask a Librarian

 

Pictorial Progress of the Construction

Before the Wrecking Ball

Phase I of the Construction

Phase II of the Construction

Phase III of the Construction

Surviving the Renovation

The Library before the Renovation

The Library after the Renovation

Back to Main Renovation Page

The Library after the Renovation

     

 

 


Home   UConn Health Center   Search   Comments   Help  Ask a Librarian

Copyright 1998 - 2006. All Rights Reserved.
Lyman Maynard Stowe Library at the University of Connecticut Health Center
263 Farmington Ave. P.O. Box 4003
Farmington, Connecticut 06034-4003
The URL for this page is: http://library.uchc.edu/renovation/pictures7.html
Last Updated: September 10, 2013