Home Health Center Search Comments Help Ask a Librarian

 

Pictorial Progress of the Construction

Before the Wrecking Ball

Phase I of the Construction

Phase II of the Construction

Phase III of the Construction

Surviving the Renovation

The Library before the Renovation

The Library after the Renovation

Back to Main Renovation Page

Phase I of the Construction

The Most Recent Pictures

March 21, 2004

   
 

 

March 22, 2004

   

March 23, 2004

 

 


March 24, 2004

 

 

March 25, 2004

 

 

March 26, 2004  

 


 


March 29, 2004

 

 

 

 

April ?, 2004

 

 

 

April 19, 2004
(completion of Phase I abatement )

     

May 3, 2004
   

   


Click the following links for movie clips.

Movie Clip1 (16.7 MB)

Movie Clip2 (8.2 MB)

Movie Clip2 (10.9 MB)


August 26, 2004 (Ceiling grid being installed in Phase I)


November 2

   
   


November 4

   
   

November 11
   
   

November 17
   
 

November 22
   

November 23
   
 

December 9
   

 

 


Home   UConn Health Center   Search   Comments   Help  Ask a Librarian

Copyright 1998 - 2006. All Rights Reserved.
Lyman Maynard Stowe Library at the University of Connecticut Health Center
263 Farmington Ave. P.O. Box 4003
Farmington, Connecticut 06034-4003
The URL for this page is: http://library.uchc.edu/renovation/pictures2.html
Last Updated: February 26, 2008